Risk Management
Released on Aug 8 , 2022
In this page, we will cover the definition of risk management and tools used and reflect on whether the tool worked during our project.

What is risk management?
Risk management is the process of identifying, analyzing and responding to any risk that may arise during a project (Ray, 2021). The risk identified is then gathered and input into a document created after the completion of the risk assessment. In the document, it should contain the details of the potential hazards or incidents that could happen during an event and a step-by-step guide to work around it. Therefore, I defined risk management as coming up with an action plan to address the potential scenarios that could happen during our event.
if the document created during the project after the completion of the risk assessment. It contains the details of the potential hazards or incidents that could happen during an event and a step-by-step guide to work around it.
What are some risk management tools used during our project?
While there are multiple risk management tools like Risk Register and Root Cause Analysis, we decided to use Avoidance, Reduction, Acceptance and Transfer (ARAT) for our project because we are all familiar with it. So what is ARAT? ARAT is a treatment plan for the potential incidents that could happen during our event. To explain further, Avoidance treatment is assigned when the scenario is too risky and not worth trying. Using our project as an example, if starts to rain heavily during our event, we have no choice but to avoid/terminate the event by postponing it to another date. For Reduction treatment, it is given to a scenario when the impact of consequences can be decreased by taking countermeasures. Moreover, for Acceptance, it is assigned to a scenario where the risk exists, and nothing you do will mitigate or change the situation. For example, there is no choice but to accept the risk of the seniors falling during our event as there is nothing we organizers can do to prevent the seniors from losing their balance and falling. Lastly, for Transfer, it means moving the risk from the organizer to an external party. For example, if one of the seniors falls during the walk, we transfer the risk of us treating the senior to a nearby medical doctor by bringing him/her to the medical clinic.
View from 2:38 to 7:04
So how did we use the tool in our project?
We first identify the potential scenarios that could happen during our event and included them in a table. We then assign a scale (1 to 10) to their severity, the likelihood of happening and the risk level of the scenario. Afterwards, we determine the action of the scenario by deciding whether we want to Avoid, Reduce, Accept or Transfer the risk. Lastly, we develop the action plan based on the decision made.
For instance, we identified that falling fruits is one of the scenarios that could happen during the event. Hence, we gave it a rating of 2 for severity as the fruits on the trees are mostly small and will not pose a risk to the participants if it drops on participants. Furthermore, our team assigned a 2 to the scenario's likelihood as participants will mostly walk around areas without trees that can bear fruits during the event. Hence, this implies a moderate risk level of fruit dropping and hurting a senior. Moreover, as the fruits are small and could not harm the participants, we decided to play safe and assign it a risk level of 4 as there might be other fruits that might be overgrown, which could be a threat. Lastly, we decided that Reduction would be the best option. To illustrate Reduction, when we notice any fruits on the trees, we will guide the participants around the tree to prevent the scenario from happening.

What value did it add to our project?
Utilizing the ARAT helped us be more prepared and confident while planning and conducting the event. As many scenarios could happen during the event, having a step-by-step action plan allow us to refer to it immediately in the event where it is needed. Fortunately, none of the scenarios happened during the event. However, it helped us be more confident while showcasing the event proposal to New Life Community Centre. As the participants from New Life Centre, it is normal that New Life wants to know what measures we have input for our event so that they can ensure their participant's safety. Therefore, they started asking us questions regarding the scenarios that could happen. Luckily, we utilized the ARAT alongside the step-by-step action plan of the scenarios and we presented it to New Life. This helped us to portray that this event was well planned and that we are reliable in managing such a huge event. Hence, New Life had more trust in us and did not have any more worries before leaving it all up to us to handle the actual event.
What are some challenges faced when using this tool?
A problem that we faced while using this tool was utilizing too much time for each risk scenario. As the mitigation determines the action plan of the risk scenario, we must appropriately allocate either Avoidance, Reduction, Acceptance, or Transfer to each risk scenario or else the outcome might be worse. For example, we anticipated that participants might encounter an aggressive animal during the walk and determined the mitigation for it to be Acceptance. This implies that the outcome might be bad as the participants must tolerate the aggressive animal, which puts them at risk of getting hurt. While another better alternative would be determining Avoidance as the mitigation plan. This means that the action plan will be to have the seniors take a short break at their current location and to let the animals leave the area first. Therefore, the participants will face no risk if we determine Avoidance as the mitigation plan.
Comparing both scenarios mentioned above, you can see that allocating different mitigation for the same risk scenarios can result in two different outcomes. Hence, we wasted a lot of time as we had difficulties allocating proper mitigation for each risk scenario due to us needing to evaluate all of the possible outcomes and come to a common consensus on the action plan.